      3C installs turn-key shoring walls.  Drilled placed and poured h-beams.  Waler, Tie back and lagging installation.
 
Design build sevices available.
30 kip to 500 kip working capacities

35 poured beams 35' to 40' through boulders, 125 kip 52 mm tie backs
52 MM tieback installation
Wales. Tie backs and Lagging
Turn Key Retaining wall. 9-5-07
Pull to 120k. Lock @ 65K