Home

Services

New York City Drilling

Completed Projects

Shoring, Retaining Walls

Helical Piles

Load Testing Info

Current Pictures

Misc Pictures

Living the Dream

Contact Us

Helical Piles
       3 Point tower with 3 85' pull down helical micro-piles in each caisson.   Caps 5' diax 6.5 feet deep.
Helical pile test to 120k 3 point tower
20k Rotary head in 16' head room, 141 piles
30 kip Helical pile installation. Philadelphia ST Chris Hosp
30 kip Helical pile installation. Philadelphia ST Chris Hosp
Helical Installation, Phil PA
Helical Installation, Phil PA
Installed Helicals prior to cut off.
Installed Helicals prior to cut off.
Helical Installation
Helical Installation
Helical Pile, Limited access DC area
Helical Pile, Limited access DC area
Helical Mount to Tower Foundation
Helical Mount to Tower Foundation
Foundation Repair Sea Girt, NJ
Foundation Repair Sea Girt, NJ
Repair of foundation cracks with high strength epoxy grout.
Repair of foundation cracks with high strength epoxy grout.
Sea Girt, NJ
Rebar Cage over helical piles
Sea Girt, NJ
Rebar threaded around existing utilities and doweld into foundation

Home | Services | New York City Drilling | Completed Projects | Helical Piles
Load Testing Info | Current Pictures | Misc Pictures | Living the Dream | Contact Us